2023/24 Club Renovations

This timeline chronicles the major updates to IRC!

Home | 2023/24 Club Renovations

Club Renovations

2023
February: Climate Control

This new amenity will provide air conditioning in the summer and consistent heat in the winter. This project is projected to be complete in Fall 2023.

June: Locker Room & Restroom

A temporary wall has been constructed in the lobby of IRC Dean to provide a safe space for workers to complete this project. This update will provide for modern, additional restroom stalls and expanded locker areas. New private showers will also be included. We anticipate this phase to be completed…
Read more

August: Locker Room & Restroom Update

The original brick, partition wall would be torn down along with the old walls & plumbing. The lockers, toilets, showers and changing rooms would also be removed.

September: Locker Room & Restroom Update

The old foundation is taken out and a new one laid in along with new plumbing.

September: Climate Control Update

The first stage included removing the heating units from the courts as well as the vent fans from courts 8 & 16. New ventilation shafts would be installed and connected to 4 individual condenser units.

October: Climate Control Update

Installation of our brand new climate control is finished! Members can expect cooler summers and warmer winters!

October: Locker Room & Restroom Update

Framing is installed and copper piping laid in as well as new ventilation.

November: Locker Room & Restroom Update

Things are moving along with the addition of insulation, wiring and drywall.

December: Locker Room & Restroom Update

The walls are set, sink fixtures, cabinets & lockers are starting to be placed as well as tiling.

2024
January: Locker Room & Restroom Update

Lighting is installed as well as brand new mirrors and toilets.