The awning for the new entrance is constructed.
Category: IRC '23/24 Renovations
July: Lobby & Entrance
The framing for the new front desk is put in place.
May: Lobby & Entrance
The main lobby is stripped of paneling, flooring and walls.
May: Lobby & Entrance
The front lobby is prepped for construction. The pro shop display is cleared of merchandise and the front desk is temporarily moved to court 9.
January: Locker Room & Restroom Update
Lighting is installed as well as brand new mirrors and toilets.
December: Locker Room & Restroom Update
The walls are set, sink fixtures, cabinets & lockers are starting to be placed as well as tiling.
November: Locker Room & Restroom Update
Things are moving along with the addition of insulation, wiring and drywall.
October: Climate Control Update
Installation of our brand new climate control is finished! Members can expect cooler summers and warmer winters!
October: Locker Room & Restroom Update
Framing is installed and copper piping laid in as well as new ventilation.
September: Locker Room & Restroom Update
The old foundation is taken out and a new one laid in along with new plumbing.